new hoose progress

We first looked at the neighborhood on July 14th and as we were driving home we called to tell them we wanted lot 6.

July 21 2024, under contract.

August 13 2024
August 26 2024
September 9 2024, still just dirt
October 4 2024, getting footings
October 20 2024
November 2 2024, start of framing. We missed seeing the slab tho
November 6 2024, 2nd story framing
November 10 2024, whoa looks like a hoose and there’s a shower in the driveway
November 17 2024, windows are in
November 24th 2024, some electrical and hvac went in
December 4 2024, siding is on and drywall in the garage
December 8 2024, pre drywall inspection
Gracie’s craft room
write on the sticks before they drywall
December 15 2024, house is drywalled
Dec 15 2024 drywall
Dec 22 2024 drywall mudding and joint compound
Dec 22 2024 it has texture
Jan 5 2025, welcome to the new year
Jan 12 2025
Jan 12 2025, a kitchen is born
Jan 19 2025, grandparents visiting
Jan 19 2025 flooring and counters
Jan 26 2025
Jan 26 2025 some carpet and trim
Feb 2 2025 a bit of paint
Feb 2 2025 a fireplace
Feb 2 2025 Gracie’s happy place
Feb 2 2025
Feb 9 2025
Feb 21 2025, inspection – it passed
March 3 2025, final form and closing
March 7 2025, backyard is graded. We chose to do the backyard landscaping ourselves.
March 10 2025 moving in
march 10 2025 move in, girls were quick to unpack what’s important
March 13 2025 front landscaping done
March 13 2025, Lyta pups. We promised the kids a dog after we moved
Mar 20 beginning landscaping
March 20 still tillin
march 24 the sod is here
march 24 layin sod
march 25 we have lawn
march 26 God’s promise
April 9, God may have promised but I didn’t
April 13 a frog. We found a frog at our old house shortly after moving in too
April 15, trees n shrubs
April 16, aspen grove
April 16 strawberry patch
April 18 a bird cam
April 19 fairy garden
April 21 hydrangea patch
April 30, built some planters
may 1, digging trenches for sprinklers
May 1 shovelin dirt
may 7 planters filled, Gracie’s garden started