We first looked at the neighborhood on July 14th and as we were driving home we called to tell them we wanted lot 6.
July 21 2024, under contract.

August 26 2024

September 9 2024, still just dirt

October 4 2024, getting footings

October 20 2024

November 2 2024, start of framing. We missed seeing the slab tho

November 6 2024, 2nd story framing

November 10 2024, whoa looks like a hoose and there’s a shower in the driveway

November 17 2024, windows are in

November 24th 2024, some electrical and hvac went in

December 4 2024, siding is on and drywall in the garage

December 8 2024, pre drywall inspection

Gracie’s craft room


write on the sticks before they drywall

December 15 2024, house is drywalled

Dec 15 2024 drywall

Dec 22 2024 drywall mudding and joint compound

Dec 22 2024 it has texture

Jan 5 2025, welcome to the new year

Jan 12 2025

Jan 12 2025, a kitchen is born

Jan 19 2025, grandparents visiting

Jan 19 2025 flooring and counters

Jan 26 2025

Jan 26 2025 some carpet and trim

Feb 2 2025 a bit of paint

Feb 2 2025 a fireplace

Feb 2 2025 Gracie’s happy place

Feb 2 2025

Feb 9 2025

Feb 21 2025, inspection – it passed

March 3 2025, final form and closing

March 7 2025, backyard is graded. We chose to do the backyard landscaping ourselves.

March 10 2025 moving in

march 10 2025 move in, girls were quick to unpack what’s important

March 13 2025 front landscaping done

March 13 2025, Lyta pups. We promised the kids a dog after we moved

Mar 20 beginning landscaping

March 20 still tillin

march 24 the sod is here

march 24 layin sod

march 25 we have lawn

march 26 God’s promise

April 9, God may have promised but I didn’t

April 13 a frog. We found a frog at our old house shortly after moving in too

April 15, trees n shrubs

April 16, aspen grove

April 16 strawberry patch

April 18 a bird cam

April 19 fairy garden

April 21 hydrangea patch

April 30, built some planters

may 1, digging trenches for sprinklers

May 1 shovelin dirt

may 7 planters filled, Gracie’s garden started